Projects / Urban rail
Metro Line 2 (Bến Thành–Tham Lương)Tuyến metro số 2 (Bến Thành – Tham Lương)
The second urban-rail line, toward the north-west. Under construction; completion now targeted for Q4 2030.
Readiness ladder · Thang sẵn sàng
Why this stage
Construction was reported to have started at the Tham Lương depot in January 2026.
Reported 15 Jan 2026 · Pháp Luật TP.HCM
Next rung — Partly operational: Some sections or functions in use; route-wide or full operation not established.
Observed stage
In plan
Approved
Investor / contractor selected
Under construction
Partly operational
Operational
Usable for business
Site / institution
Milestones · Mốc kế hoạch và thực tế
Planned against achieved
| Milestone | Planned / target | Achieved | Status | Source |
|---|---|---|---|---|
| Construction start | — | 15 Jan 2026 | Achieved | Pháp Luật TP.HCM |
| Completion | Q4 2030 | — | Pending | Pháp Luật TP.HCM |
Evidence · Bằng chứng
What the record shows
- Reported15 Jan 2026The groundbreaking was held on 15 January 2026 at the Tham Lương depot. The adjusted project was approved by the city on 31 December 2025, with completion set for Q4 2030; THACO was selected as main EPC contractor. It is the first city project to use the special mechanisms of Resolution 188. VIRO found no newer progress report.
- Reported15 Jan 2026This phase is 11.3 km from Bến Thành along Cách Mạng Tháng Tám and Trường Chinh, ending at Tân Bình station rather than at Tham Lương, which the line is named for.
Unknown · Chưa rõ
- Current physical progress.
VIRO analysis
Line 2 is the test of whether the network target for 2030 is realistic.
Serves
Pole 1 · International core
Pole 3 · Western urban–health–education pole
Corridor · North–South corridor
Poles & corridors →Sources · Nguồn
- HCMC officially starts construction of Metro Line 2 — Pháp Luật TP.HCM, 15 Jan 2026
Next project: HCMC–Mộc Bài Expressway